Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | None |
Date time: | 3.58pm, Saturday 21st May, 2022 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | jtn20 |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
The cut-through from Warren Road to Eastfield, after removal of the short-lived chicane barrier of #182428. (A bollard still prevents cars from using the cut-through.)
See #182844 for the view from the other side.
Comments reflect the views of the original submitter only.